Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2306

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美大交乱xxxxbbbb| 亚洲精品亚洲人成在线播放| 在线观看国产福利| 亚洲免费视频网| 四虎永久免费地址ww417| 日本一级毛片免费| 男人猛躁女人成人免费视频| 久久久久久久久a免费| 国内拍拍自拍视频在线观看| 国产嘿咻| 在线亚洲精品| 四虎1515hh免费大炮社区| 美女伊人| 国产精品一级片| 在线观看日韩精品| 色老头成人免费视频天天综合| 老妇综合久久香蕉蜜桃| 精品国产一区二区三区四| 国产第一区二区三区在线观看| 在线播放免费一级毛片欧美| 色网址在线| 久久欧美精品欧美九久欧美 | 欧美成人四级剧情在线播放| 狠狠色丁香久久婷婷综合五月| 99热久这里都是精品小草| 一级毛片美国一级j毛片不卡| 午夜国产福利| 青草视频网| 久久精品中文字幕首页| 国产欧美曰韩一区二区三区| www精品视频| 亚洲狠狠色丁香婷婷综合| 欧美日韩一区二区三区自拍| 久久国产精品亚洲综合| 国产乱码精品一区二区三上| 中文福利视频| 日日搞夜夜操| 久热精品在线视频| 国产日产欧美一区二区三区| 99热久久这里只有精品首页| 香蕉视频日本|