日本免费一区二区在线观看-日本免费一区视频-日本免费在线-日本免费在线播放-日本免费在线观看-日本免费在线观看视频

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.58804.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5300

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 中文字幕第一区| 精品欧美一区二区三区免费观看 | 亚洲精品一区二区伦理| 日韩不卡中文字幕| 久久是免费只精品热在线| 精品一区二区三区在线观看l | 色综合天天综合网站中国| 青青青爽在线视频观看| 男人猛桶女人下面视频国产| 好吊妞视频998www| 99精品视频在线视频免费观看| 一区二区三区网站在线免费线观看 | 夜夜久久| 日韩精品亚洲人成在线观看| 久久久成人影院| 高清不卡| 在线欧美激情| 亚洲国产欧美91| 色爱区综合激情五月综合激情| 欧美三级欧美成人高清www| 久久精品国产这里是免费| 国产男女爱视频在线观看| 综综综综合网| 亚洲qingse中文久久网| 欧美日韩亚洲区久久综合| 久久国产三级精品| 国产精品人伦久久| 曰本性l交视频| 日韩欧美一区二区三区不卡| 久久精品国产亚洲a| 成人欧美在线| 一a一级片| 日本一区二区网站| 久久久久综合| 国产毛片精品| 伊人狼人视频| 日本一级毛片片免费观看| 久久一区二区精品| 国产91在线 | 中文| 亚洲精品一区二区三区在线播放 | 99久久国产免费福利|