日本免费一区二区在线观看-日本免费一区视频-日本免费在线-日本免费在线播放-日本免费在线观看-日本免费在线观看视频

Language:CHINESESENGLISH

Home > News > Macau's first single large span reticulated shell steel structure engineering cap
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.58804.cn

Macau's first single large span reticulated shell steel structure engineering cap

Time:[2015-10-14]  Hits:4739

Guangzhou Steel News: Macau's first single large span reticulated shell steel structure engineering cap

Recently, MGM Cotai hotel project engineering sky cap. It is reported that the project is two-way bias diagonal saddle hyperboloid form a monolayer structure large span reticulated shell, is the first in Hong Kong and Macao regions.

Reporters learned that the project by the China Building World Group general contractor, China State Construction Steel Co., Ltd. is responsible for construction and deepening of the design, manufacture and install. Engineering is about 1900 tons of steel, the maximum span of 140 meters, the projection area of ​​nearly 1.5 standard football field.


The project design dynamic lightweight construction steel structure is necessary to ensure that "no weight overruns," but also "the body strong enough." How to root after more than 5,000 bars and non-standard sizes like 1500 nodes personalized design and production of combines is a not a small problem, it is built in steel design staff, they repeatedly conducting research , from the cellular to be inspired, creative use of external double hollow hexagonal prism nodes form a useful structure to reduce the weight of a quarter, and is configured to connect stable. In the production chain, the project also "experience" to a lot of difficulty. Steel engineering project by each node 6 sizes totaling 48 parts board group fight together in diameter from 40 centimeters to 100 centimeters, the number of welds from 40-50, built in steel production staff He said welding this node is simply in embroidery, but by concentric positioning optimization, weld optimization and other measures, useful for the production of precision error strictly controlled within the requirements of British Standard Specification 3 mm. In the apparatus of the process, the use of point-in support system in a small space to ensure the load path clear, while using three-dimensional coordinates of the law means good control precision by 144 support points. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 四虎免费看| 国产在线91精品入口| 成人欧美视频在线看免费| 亚洲伊人国产| 日韩欧美视频在线一区二区| 欧美视频性| 久久久国产麻豆| 国产亚洲99影院| 成人免费视频一区二区| 亚洲综合日韩| 日本一区二区中文字幕| 久久精品国产亚洲高清| 成人人观看的免费毛片| 亚洲欧美不卡中文字幕| 奇米影视999| 极品福利| 97精品国产综合久久久久久欧美 | 成人免费黄网站| 亚洲精品综合一区在线| 欧美又粗又硬| 韩国女主播一区二区三区视频| 99国内精品久久久久久久| 亚洲天堂不卡| 青青热久久国产久精品秒播| 精品一区二区三区在线观看| 国产高清在线91福利| 一本一道久久| 日本精品中文字幕在线不卡| 久久最新网址| 国产成人精品一区二区免费视频| 亚洲综合精品一二三区在线| 日本国产一区二区三区| 精品国产96亚洲一区二区三区| 97午夜精品| 视频在线成人| 男人的天堂视频| 国产精品午夜波多野结衣性色 | 日韩欧美国产高清在线观看| 久草综合在线观看| 国产边打电话边被躁视频| 中文伊人|