Guangzhou Steel teach you: Steel supervision next station control points

(1) Before the construction supervisors to deal with the approach of materials (steel, high-strength bolts) check, approach the material must have factory quality certificate and sampling site is intended for use after passing inspection, welding rod, wire, flux should meet the requirements .
(2) Check the installation of the production staff of technical welder qualification certificate, so certificates.
Welding income margin, cutting and other allowance and column in compression load deformation value (3) the material according to process requirements, making installation reserved.
(4) member when assembled, to prevent distortions member bagging inaccurate.
(5) welding to adhere to a thickness greater than 50mm carbon structural steel and low-alloy structural steel before welding larger than 36mm preheat hot after welding performed.
(6) the quality of the weld seam inspection in addition to dimensions, surface quality inspection, but also check the internal weld defects, according to the requirements of the drawing to determine the grade of weld quality grade and defects NDT.
(7) Before installing the column, a detailed examination of the relative position of the axis of the anchor bolts and offset.
(8) a single vertical column of steel columns, with one column capitals elevation sections deviations on the wrong port value under the column connection.
(9) Guangzhou Steel steel member during product delivery, product quality must have approval and certification, in order to be sent to the installation site, after installation departments for product acceptance Engineer focused on installation and connection components in place to check on the situation and members steel members connected with the concrete peg holes reservation wear bars.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 9久热这里只有精品视频在线观看 9热在线精品视频观看 | 99超级碰碰成人香蕉网| a级免费网站| 亚洲涩色| 天天操狠狠操| 欧美国产日韩在线观看| 久久久夜夜夜| 黑人超长巨大xxxxxxx视频| 国产精品21区| 在线观看视频99| 亚洲国产视频在线| 请看一下欧美一级毛片| 免费二区| 精品午夜寂寞黄网站在线| 国产精品综合网| a国产视频| 亚洲va在线va天堂va手机| 色国产视频| 欧美激情免费看| 国产在线麻豆精品| 草莓视频在线观看精品最新| 一区二区三区不卡在线| 婷婷在线观看网站| 奇米第四影视| 久久免费激情视频| 国产成人区| 最新国产午夜精品视频成人| 亚洲欧美高清在线| 色黄啪啪网18以下免费进| 久久亚洲欧美| 国产欧美日韩高清专区ho| 99热这里只有精品一区二| 香蕉色综合| 欧美中文字幕在线视频| 久久国产首页| 成年女人毛片免费视频| 亚洲成人在线播放视频| 欧美高清在线视频在线99精品| 国产无套免费网站| 97视频 久久久| 四影虎库最新2021|