Time:[2016-1-23]  Hits:4516

Guangzhou Steel teach you: steel welding engineering

(A) material quality requirements
(1) Canton steel welding works with a welding rod, wire, flux, electroslag weld mouth, studs, welding porcelain ring and shielding gas welding, etc. must be used with a factory quality certification, quality inspection reports and other documents.
(2) Guangzhou steel welding engineering, the general principles of the weld metal and base the selection of materials, such as strength of welding rod, wire, solder and other welding materials.
(3) welding, flux cored wire, electroslag weld mouth and studs with ceramic ring before use, must be baked in accordance with the provisions of the product description and related welding processes.
(Ii) quality control during construction
(1) When the welding operations ambient temperature is below 0 ℃ but not lower than -10 ℃, welded joints and welding surface should be in each direction is greater than or equal to 2 times the plate thickness range of not less than 100mm is heated to not lower than 20 ℃ After the minimum preheat temperature specified above and before welding, and the welding process should not be below this temperature.
Room (2) pre-heating and temperature control channels should adopt electric heating, flame heating and infrared heating plus heat method, and using special thermometer measurements. Preheat the welding area should be heated on both sides of the groove width of more than 1.5 times the thickness of the weldment welding, and not less than 100mm. Temperature measurement point, when non-members should be on the back of an enclosed space heating surface in the weldment from both sides of the weld groove at not less than 75mm, when the member is a closed space should be in the front side from the weld groove at not less than 100mm. When the process of selection of the preheating temperature is below the minimum specification requirements should be determined by the procedure qualification test.
(3) non-sparking arc welds on the base metal outside the area. In the groove arc welding a local area should not be leaving the crater. When the arc plate, lead plate and spacer plate when the steel should be used in the yield strength of not more than the nominal strength steel is welded steel, and weldability similar.
(4) The multilayer welds should be continuous welding, weld bead after each layer should be cleared up.
(5) Such as design documents or the contract documents required butt eliminate stress, the structure of the tensile stress fatigue check node butt or weld-intensive, member, should adopt the electric heater and partial annealing furnace annealing overall and other methods of stress relief treatment; if only stable structure size, vibration method can be used to eliminate stress.
(6) with a hammer method to eliminate intermediate solder layer stress, you should use the network first hand hammer or a small vibrating tool, should not be the root of the weld, the weld cap weld or bevel edge of the base material hammer.
(7) carbon steel welds should be cooled to ambient temperature, low-alloy steel should be after the completion of the welding seam 24h NDT testing.
(8) checks should be carried out after bending test weld stud welding, stud weld and heat affected zone bend 30 ° after there is no visible cracks.
(9) the repair welds should be continuous welded parts, should be taken if an interrupt after welding heat insulation measures to prevent cracks; repairing defects in the weld of the same parts of the number should not be more than twice the area of ​​welded joints should be increased after the repair powder or colored checks.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 这里只有精品在线观看| 国产真实偷乱视频在线观看| 看真人视频一级毛片| 国产综合色香蕉精品五月婷| jiucao视频在线观看| 亚洲另类图片专区| 日本aⅴ在线| 九九在线免费观看视频| 国产欧美精品一区二区三区四区| 99九九久久| 午夜欧美在线| 欧美高清视频www夜色资源| 久久久99精品免费观看| 国产激情视频一区二区三区| 在线国产中文字幕| 色视频在线免费观看| 久久色亚洲| 大学生一级毛片高清版| 亚洲欧洲日产国码天堂| 人成午夜视频| 精品久久久久久| 99九九成人免费视频精品| 亚洲91在线视频| 欧美成人四级剧情在线播放| 久草在线观看免费| 草莓视频在线观看精品最新| 亚洲精品一区二区三区福利| 色操网| 久久久综合中文字幕久久| 国产成人cao在线| 亚洲欧美日韩综合| 日韩在线 中文字幕| 欧美激情一区二区三级高清视频| 国产在线视频凹凸分类| 最近中文字幕精彩视频| 色综合色综合色综合色综合| 久久青草免费线观最新| 成人网影| 性色va| 欧美伊人久久久久久久久影院| 久久伊人一区二区三区四区|