Foshan main steel members (b)

Time:[2016-5-14]  Hits:5051

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美成人午夜在线全部免费 | 国产在播放一区| 久久9966e这里只有精品| 国产中文字幕一区| 国产xxxx做受性欧美88| 97久久精品人人澡人人爽| 亚洲国产欧洲| 色女人综合| 欧美大片天天免费看视频| 精品久久久久久久高清| 不卡一二区| 亚洲精品香蕉一区二区在线观看| 手机免费在线观看| 噜噜噜天天躁狠狠躁夜夜精品| 国产桃花视频| riav久久中文一区二区| 亚洲精品视频在线观看免费| 青青草久热精品视频在线观看| 久草视频播放| www.久久久| 香蕉狠狠干| 欧美成人69| 国产一区二区三区影院| 69网站在线观看| 亚洲aa视频| 欧美激情免费看| 久草最新在线| 波多野结衣三区| 亚洲sss视频| 女人18毛片特级一级免费视频| 九九精品成人免费国产片| a4yy私人毛片| 亚洲免费久久| 青草国产精品久久久久久| 精品色视频| 999精品视频这里只有精品| 天天欲色成人综合网站| 欧美日韩在大午夜爽爽影院| 狠狠色噜噜综合社区| 91国内精品久久久久影院优播| 四虎国产精品免费久久影院|