日本免费一区二区在线观看-日本免费一区视频-日本免费在线-日本免费在线播放-日本免费在线观看-日本免费在线观看视频

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.58804.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3151

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 香蕉依人| www久久精品| 国产精品五月天| 成人看的一级毛片| 亚洲综合色婷婷久久| 婷婷涩五月| 日本高清不卡码| 久久精品国产精品青草不卡 | 大陆老太xxxxxxxxhd| 3d动漫精品成人一区二区三| 香蕉视频在线免费播放| 欧美性猛交xxx嘿人猛交| 久久人人爽人人爽| 国产精品福利在线观看| 在线 | 一区二区三区四区| 亚洲第一区香蕉_国产a| 欧美一级毛片免费看高清| 久久亚洲一级α片| 国产呦系列免费| 91最新免费观看在线| 五月激激| 免费羞羞网站| 国产精品美女久久久久网| 伊人影院在线观看视频| 日韩一区二区久久久久久| 久久精品一区二区影院| 成人黄色在线| 亚洲国产成人久久综合区| 欧美精品在线看| 精品亚洲在线| 99久久国产免费中文无字幕| 午夜欧美福利视频| 免费播放欧美毛片| 国产真实强j视频在线观看| 91在线播放视频| 水蜜桃久久| 久久精品国产99国产精品亚洲| 澳门一级特黄录像免费播黄| 亚洲成人精品久久| 免费黄片毛片| 国产成人亚洲毛片|