日本免费一区二区在线观看-日本免费一区视频-日本免费在线-日本免费在线播放-日本免费在线观看-日本免费在线观看视频

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.58804.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2570

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产欧美乱码在线看| 尤物视频在线播放| 亚洲精品国产第一综合99久久| 午夜剧场在线观看| 色婷婷免费视频| 欧美亚洲高清| 精品视频中文字幕| xxxx免费国产在线视频| 在线观看亚洲免费| 亚洲aⅴ久久久噜噜噜噜| 奇米91| 九九精品视频免费| riav久久中文一区二区| 一级特级欧美午夜片免费观看| 涩色涩| 久久久视频在线| 国产不卡在线| 亚洲天码中字| 色综合亚洲欧美在线| 狼人射综合| 国产福利在线观看视频| 一级欧美毛片成人| 日本一区中文字幕| 九九热香蕉视频| 99热久这里都是精品小草| 亚洲va国产va欧美va综合| 欧美黄色录像| 国产九九热| 2020国产精品视频免费| 亚洲短视频在线观看| 欧美日韩成人在线| 精品在线一区二区三区| 99视频精品| 天天天天色| 欧美色xxx| 国产一级精品毛片| 99热久久这里就有精品| 五月天婷五月天综合网在线| 免费的毛片视频| 国产一级毛片午夜| 在线亚洲播放|