Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2631

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲国产中文在线| 国产区在线观看视频| 老师邪恶影院a啦啦啦影院| 久久国内| 好吊妞精品视频| 国产成人香蕉在线视频网站| 中文字幕最新在线| 性xxxxbbbbxxxx中国| 日韩视频中文字幕| 久青草国产在线视频亚瑟影视| 久久精品视频在线| 国产成人精品一区二区三在线观看 | 亚洲图片在线观看| 午夜精品久久久久| 日本一区网站| 久久国产亚洲精品| 高清不卡免费一区二区三区| 亚洲无卡视频| 日本老太做爰xx| 毛片免费观看网址| 国产精品夜色一区二区三区 | 日韩欧美区| 久久精品免费大片国产大片| 福利视频一区二区| 亚洲日日| 欧美在线国产| 狠狠色丁香婷综合久久| 91视频观看免费| 四虎影午夜成年免费精品| 日本xoxo在线观看免费| 久草观看视频| 国产成人在线观看免费网站| 91视频官网| 桃色成人精品网站| 久久综合九九亚洲一区| 国产视频a区| 在线视频一二三区2021不卡| 色丁香综合| 美女叫春| 国产高清在线精品一区二区三区| 夜夜爽夜夜操|