日本免费一区二区在线观看-日本免费一区视频-日本免费在线-日本免费在线播放-日本免费在线观看-日本免费在线观看视频

Language:CHINESESENGLISH

Home > News >
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.58804.cn
Benefits of pre-fabricated metal warehouse building
It is estimated that 75-80% of commercial buildings consist of prefabricated steel structures. Prefabricated metal buildings are a way to quickly build a project that is suitable for a wide variety of uses. With the demand for warehouses expected to ...
2022/2/24
Design principles of prefabricated steel structures
In recent years, with the increase in the number of construction projects in China and the expansion of construction scale, people's requirements for architectural design have become higher and higher. If traditional design concepts and methods conti...
2022/2/23
Main reinforcement construction methods of steel workshop building reinforcement
The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop...
2022/2/17
What measures often appear in the reinforcement technology of steel structures?
Steel structure is a structure mainly composed of steel materials and is one of the main types of building structures. The structure is mainly composed of steel beams, steel columns, steel trusses and other components made of section steel and steel ...
2022/1/15
How to prevent corrosion of building steel structure?
Under normal circumstances, the steel structure does not corrode or corrodes slowly after adding a protective layer. The life of some buildings can reach hundreds of years, but under some conditions, the steel structure has an amazing corrosion rate,...
2022/1/11
Fire protection measures for steel frame warehouse
With the rapid development of China's steel structure construction, steel structure engineering has become the mainstream of China's industrial construction industry because of its simple design structure, light weight, high strength, fast constructi...
2021/12/23
What are the requirements for conventional prefabricated steel structure building materials?
Steel structure is a structure mainly composed of steel materials and is one of the main types of building structures. The structure is mainly composed of steel beams, steel columns, steel trusses and other components made of section steel and steel ...
2021/12/16
Winter construction measures for metal workshop building
a. The winter construction of steel structure production and installation shall be carried out strictly in accordance with the relevant steel structure winter construction regulations. b. When steel components are installed at positive temperature a...
2021/11/24
What equipment is necessary in the installation of steel structure warehouse
What equipment is necessary in the installation of steel structure warehouse In the view of many people, it is very normal for steel structure warehouse to be recognized by everyone. After all, it has more advantages in the whole and details than tr...
2021/11/4
How to distinguish between multi-layer steel structure and single-layer steel structure
When the temperature of the steel structure changes from zero to 150 ℃, the fire resistance of the steel structure decreases greatly, but the test shows that the fire resistance grade of the steel structure decreases from zero to 600 ℃. When the stee...
2021/10/7
Difference between multi-storey steel structure and steel structure
Difference between multi-storey steel structure and steel structure Multi storey and high-rise steel structure is the second largest building material after water: it has the characteristics of versatility, durability and easy manufacture, and can b...
2021/9/26
Steel structure warehouse hoisting process and hoisting plan-Chapter 1
Hoisting process   Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completi...
2021/9/25
page:5  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  31  32  33  34  35  36  37  38  39  40  41  42  43  44  45  46  47  pervious next  
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 九天玄帝诀高清300集免费观看| 7777精品伊人久久久大香线蕉| 91精品国产91| 香蕉色综合| 日日射天天干| 欧美另类videos粗暴黑人| 久久久噜久噜久久综合| 国产一区二区三区免费| 99精品视频在线观看| 亚洲123区| 欧美另类交视频| 黄色成人在线播放| 99re66热这里只有精品首页| 亚洲无吗在线视频| 四虎黄色网| 美女视频黄是免费的| 黄色在线免费观看网站| 99夜色| 亚洲天天操| 四虎国产精品永久一区| 免费a级毛片出奶水| 国产精品亚洲第一区二区三区| 成人性色生活片全黄| 亚洲一区二区三区在线| 日本三级一区| 久久影院视频| 国产成人一区二区三区高清| 58av国产精品| 四虎影院黄色| 欧美日韩在线播放| 久久成人亚洲| 国产成人在线观看免费网站| 中文字幕在线最新在线不卡| 四虎成人影视| 久久久在线视频精品免费观看| 国产91小视频| 越猛烈欧美xx00动态图免费| 日一级片| 老司机福利深夜亚洲入口| 国产精品久久久久久影视| 91精品国产免费自在线观看|